This project was my favorite to make/ view, during the 48-hour time period i was extremely pressed for time. Making the project that much more rewarding for me after its completion. Basically i didn't have any idea what i could do for this project or how for that matter i was going to shoot it......cell phone, digital video mode on a still camera, scanner, frame by frame stills all possible, but with time being such a large factor i all could think about was which one was the most attainable. But then all at once after hearing a tech-no song the night before (which i replaced with the Kings of Leon) i thought of something simple and very beat savvy, as well as something obvious to the viewer that could be shot in a single location.... the changing of my clothes to the beat of a song (with blocks). Which to my surprise was a hit with people........ NICE!
But after all the projects where finished and then screened i was nothing shy of inspired by all the creativity that unfolded with three simple blocks in a 48 hour time span as well as the quality of work that was presented at the screening.
The after party end of the year screenings was fun and the cider was banging.......thanks for the memories!
-matt evans
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment